Finished Project Demir Export - Bakirtepe Gold Mine, Sivas, Turkey

Demir Export - Bakirtepe Gold Mine, Sivas, Turkey

 

PROJECT TYPE Contractor to Demir Export
STATUS Completed
CONTRACTED AS Contractor 
CLIENT Demir Export 
COMPLETION 2014 
DESIGN PERIOD 120 days 
CONSTRUCTION PERIOD 180 days 

SERVICES PROVIDED

  •          Civil Design
  •          Structural Steel Design, Manufacturing
  •          CIC Columns Design, Manufacturing
  •          ADR Plant Design & Equipment Provision
  •          Laboratory Design, Installation, Equipment Provision
  •          Electric Design and Equipment Supply
  •          Reagent Mixing, Storage and Distribution Areas Design and Construction
  •          Heap Leach and Ponds Pump Station Design,
  •          QA/QC, HSE Documentation
  •          Automation

 

BACKGROUND

Sivas Bakırtepe gold deposit is located in 81,5 km southeast of Sivas City, 24 km east of Kangal District, 7 Km southeast of Cetinkaya Town. The Mine license of the reserve, whose potential was discovered with prospecting, exploration and drilling, was taken from the General Directorate of Mining Affairs' tender in 2006. Environmental baseline studies have started within the scope of environmental impact assessment. In addition, design and engineering studies of ore processing (leach pad) and mining have started.

 

PROJECT DESCRIPTION

Demir Export Bakırtepe Gold Mine is heap leach operation with 2 ton CIC carbon process capacity and 1 ton stripping process capacity ADR plant designed by CH and provision and installation by CH Engineering. By the time the plant is taken into operation CH will finalize a turn-key service for designing, supplying and erecting the reagent, CIC, ADR, refinery as well as pump station of the HLF. Further commissioning, start-up, supervising and staff training services will also be given as part of the contract.