Finished Project Amesmessa - Trek Gold Mine, Algeria

Amesmessa - Trek Gold Mine, Algeria

 

PROJECT TYPE Prime Contractor
STATUS  Completed
CONTRACTED AS Prime Contractor 
CLIENT Enor Spa 
COMPLETION 2007 
DESIGN PERIOD 30 days 
CONSTRUCTION PERIOD 90 days 

SERVICES PROVIDED

  •          Structural Steel Design & Manufacturing
  •          CIC Columns Design & Manufacturing
  •          ADR Plant Installation
  •          Start-up & Commissioning
  •          Staff Training

 

BACKGROUND

The Amesmesa gold deposit is located 12 km North – South of Ouzzal. The Amesmessa mine is currently in production Approximately 3.7 tons of gold were produced by the Heap Leach. Also the Tirek gold deposit is located at about 64 km north of the Amesmessa mine. Algeria Power and Resources Minister attended the first Gold pour at the plant.

 

PROJECT DESCRIPTION

Amesmesa – Tirek gold mine use both CIC and CIL system and it has 4 tons ADT plant.  CH Site Team supplied professionally all required installation ADR and CIC tools. All plant was erected, commissioned and started up in 4 months under challenging conditions. CH site team had completed 160 Tons of Structural Steel Erection, 5 Steel Tank Installation, Over 5000 meters of CS and UPVC piping, 87 Equipment Installation & Start up