Finished Project Tuprag (Eldorado Gold) / Kisladag Gold Mine, Usak, Turkey

Tuprag (Eldorado Gold) / Kisladag Gold Mine, Usak, Turkey

 

PROJECT TYPE Subcontractor To Summit Valley
STATUS Completed
CONTRACTED AS Subcontractor 
CLIENT Tuprag (Eldorado Gold) 
COMPLETION 2006 
DESIGN PERIOD 180 days 
CONSTRUCTION PERIOD 330 days 

SERVICES PROVIDED

  •          Structural Steel Design & Manufacturing
  •          CIC Columns Design & Manufacturing
  •          ADR Plant Installation
  •          Start-Up & Commissioning
  •          Staff Training

 

BACKGROUND

Kisladag gold mine is located 30 km southwest of Uşak city in Turkey. The Kisladag gold deposit is 180 M tons. ore and one ton of ore contains about 1,07 grams of gold. Kisladag Gold Mine is Europe’s biggest heap leach operation with 8 ton carbon process capacity. ADR Plant designed by Summit Valley and installed by CH Engineering

 

PROJECT DESCRIPTION

The Kisladag gold mine has 8 tons ADR plant and three train of CIC system. As we CH consultants, we completed 160 Tons structural steel erection, 10 CIC tanks manufacturing and installation, ADR and CIC equipment installation and start – up, complete gold room (electrowinning cells, refinery system) system installation and Start up with staff training